As of 1st May 2025, National Plastics & Rubber has officially moved to Westpac for all banking transactions. Please ensure you use our new bank details for any payments. If you haven’t already, please confirm the new details with our Accounts Team at accounts@nationalplastics.net.au. Thank you for your cooperation and support during this transition.
Home » Stacko™ Assembly Instructions
Inspect all components for damage and serviceability.
Before using these products you must perform your own risk assessment.
Position the base on a solid, level surface suitable for the expected load being supported.
Place 3 Stacko™ Blocks in the Base Pad grooves to complete the first layer.
Begin the second layer by placing another 3 blocks in the opposite direction of the first layer.
Simply repeat adding layers in alternating directions until the desired height is reached.
Up to a maximum of 150cm (60”). Before building the top layer see the next step.
Depending on the stack configuration, the top layer of blocks may need to be turned on their side to allow for a flat top surface. See reference table below.